Fire alarm system installation for commercial premises: the stages explained
A fire alarm installation is shaped by your fire risk assessment and the British Standard for non domestic systems. Understanding the stages helps you ask for the right information and records.
- Free site inspection and quotation
- Engineer led, no salespeople
- No callout charges for 3 months after installation
Before you buy
Start with the fire risk assessment, not the equipment
Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person for non domestic premises in England must carry out a fire risk assessment. That assessment should identify how a fire will be detected and how people will be warned, which in turn sets the brief for any alarm system.
BS 5839-1 is the code of practice for fire detection and alarm systems in non domestic premises. It covers design, installation, commissioning and maintenance, and it is the usual reference against which a system is specified and checked.
This guide explains what typically happens at each stage, so you can plan disruption, gather the right documents and recognise a properly completed job. It is general information, not a substitute for a competent fire risk assessor.

Agreeing the category and design
The fire risk assessment, and sometimes your insurer, will indicate the level of protection needed. In BS 5839-1 terms this is the system category, such as a life protection category covering escape routes or wider coverage throughout the building.
The designer then produces drawings showing the panel position, detector and call point locations, sounders and beacons, zones and cable routes. Ask for any variations from the standard to be listed and agreed in writing.
Think about how the building is really used. Kitchens, dusty production areas, high warehouse roofs and rooms that are often locked all affect the design and are worth mentioning early.
Choosing and siting detectors
Detector choice depends on the room. Optical smoke detectors suit many offices and corridors, heat detectors are often used where steam or fumes would cause false alarms, and multi sensor devices combine methods. Tall open spaces may suit beam detection.
Siting matters as much as type. Spacing from walls, ceiling height, beams, air movement and racking all influence whether smoke or heat reaches a detector in time. These rules come from the design standard rather than guesswork.
Manual call points are normally placed on exit routes and at storey exits so people can raise the alarm as they leave. Sounders and visual beacons are positioned so warnings can be heard or seen throughout.
Cabling and first fix
Fire alarm circuits use fire resisting cable, supported so it stays in place during a fire. Routes are planned to avoid damage and to keep the system working long enough to warn occupants.
The panel needs a dedicated, clearly labelled mains supply and standby batteries. Mains connections should be made by a competent electrician to current wiring regulations; this is not a job for staff to attempt.
In occupied buildings the work is often phased so that existing protection stays in place until the new system is ready. Agree how the premises will be protected during the changeover.
Commissioning and testing
Once devices are fitted, every detector, call point and sounder is tested, the panel is programmed with clear zone and device descriptions, and sound levels are checked across the building.
Cause and effect, meaning what the system does when each device operates, should be tested too. That includes links to door holders, access control releases or other equipment where these form part of the design.
Commissioning should also confirm that the battery standby works and that any remote signalling reaches its destination. Problems found here are much easier to resolve before the installers leave.
Handover and ongoing responsibilities
At handover you should receive the certificates for design, installation and commissioning, as-fitted drawings, operating instructions and a log book. Keep these with your fire safety records.
Someone on site should be shown how to read the panel, silence and reset it correctly, and carry out the weekly call point test. Ongoing servicing is recommended at least every six months under BS 5839-1.
Update your fire risk assessment and emergency plan to reflect the new system, and brief staff on what the alarm sounds like and what they should do when it operates.
FAQs
Fire alarm system installation: frequently asked questions
Is a fire alarm a legal requirement for business premises?
The Fire Safety Order requires a fire risk assessment and suitable arrangements for detecting fire and warning people. In most commercial buildings that means a designed fire alarm system. Take advice from a competent fire risk assessor.
Who decides where smoke and heat detectors go?
The system designer, working from the fire risk assessment and BS 5839-1. Room use, ceiling height and potential false alarm sources all influence the type and spacing of detectors.
Can a fire alarm be installed while we are open?
Often yes, with phased work and careful planning so that existing protection remains until the new system is commissioned. Agree working areas and changeover arrangements beforehand.
What paperwork should we get after installation?
Expect design, installation and commissioning certificates, as-fitted drawings, user instructions and a log book. Keep them with your fire risk assessment and make them available to servicing engineers.
How often should a new system be tested and serviced?
A weekly user test of a call point is normal practice, and BS 5839-1 recommends servicing by a competent person at least every six months. Record both in the log book.
Can the fire alarm link to our access control or door holders?
Often yes, where the design includes it. Links such as releasing access controlled doors or closing held open fire doors must be tested at commissioning and at each service visit.
Further reading
Related commercial security guides
Fire alarm categories
A fire alarm category describes a protection objective and its coverage. Choose it through the fire risk assessment and competent design, not by assuming that every commercial building needs the same arrangement.
Read the guideConventional vs addressable fire alarms
Understand zone and device identification, wiring, fault information and why the fire risk assessment determines the final design.
Read the guideFire alarm log book and tests
A fire alarm log book turns routine checks and unexpected events into an accountable record. Weekly user tests support that record, but they do not replace competent servicing or a suitable fire risk assessment.
Read the guideReduce false fire alarms
Repeated unwanted fire alarms disrupt work and can weaken trust in the warning system. Reduce them through investigation and controlled improvements, never by encouraging staff to ignore signals or leave detection disabled.
Read the guide
Sources
External references used for this guide
Planning a new fire alarm system?
Arrange a free site inspection and consultation so an engineer can look at the building, talk through how it is used and explain the options in plain terms.
Free site inspection
Discuss your fire alarm installation
Share your building type, how it is used and any fire risk assessment findings, and we will arrange a site inspection.
Or email info@msmesecurity.co.uk
- Monday to Friday: 9am to 6pm
- Saturday and Sunday: 11am to 5pm